Sir Robert McAlpine is currently working on a major project behind a retained façade on Grosvenor Place, London. During the demolition phase, a significant façade retention structure was constructed which posed some challenges when it came time for removal.
One side of the project backs onto a TfL red route. Due to the pedestrian and vehicle traffic, TfL required the façade retention structure to be removed at night. This posed significant challenges given the location of the project within a residential area in Belgravia, and Westminster Environmental Services understandably had a lot of concerns. To mitigate the impact of the works, SRM along with Salter Demolition, implemented measures to ensure our neighbours were not disturbed by these works overnight: