Wheels for Steelwork Fabrication

The structural steelwork trusses for this project were designed to span above the width of the A38 dual carriageway tunnel and to support the 14-storey building above.

There are 16 trusses in total, each with maximum length of 35m, maximum depth of 6m, and weighing up to 119 tonnes. The decision was made to assemble the trusses wholly within the factory of the structural steelwork subcontractor, including fully welded connections and intumescent and decorative painting, the benefits being better quality control, and for quicker and safer installation.

In order to assist the welding and painting of the trusses, the subcontractor manufactured steel wheels, which were capable of supporting and turning the steel trusses during the fabrication process, such that the trusses could be turned around, to save the welders and painters needing to work underneath the fabrication jigs, thereby giving improved working conditions. These therefore ensured consistent quality.

Footer Reference

Entry submitted by Sir Robert McAlpine


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

Best Practice Hub
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible.

Cookies are small pieces of text sent to your web browser by a website you visit. A cookie file is stored in your web browser and allows the site or a third-party to recognise you and make your next visit easier and the website more useful to you.

Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

We only use cookies to improve your experience and monitor web traffic. All data we collect on this site is anonymous and not shared or sold. Please find more information here

The Best Practice Hub is provided by the Considerate Constructors Scheme