Online Waste Bin Request System

This project is a mixed use scheme sited on the Old Scotland Yard site, consisting of 268 fully fitted out residential units which are incorporated within 6 residential towers which sit above the podium buildings. Therefore, there is not much space available for waste bins on work areas.

The contractor have instructed their logistics subcontractor to provide an ‘Online Waste Bin Request’ system, so that subcontractors need to order their waste bin the day before by latest 14:00, providing quantity and type of waste bin (plasterboard or mixed waste). Wheeled bins will then be on the floor plates ready for the works in the morning.

Bins have been numbered, so subcontractors can identify their bins. Also, once waste bins are delivered to work area, pictures are shared on the ‘Bin Request WhatsApp Group’, as evidence.

Footer Reference

Entry submitted by Multiplex


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme