Temporary Working Platform

1 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 5

This contractor is using a lightweight, retractable concertina deck which can be quickly and easily deployed across floor joists to create a temporary working platform for operatives.

Whilst lightweight, it has a safe working load of over 150kg. The platform can be installed from the floor below to prevent any operative working on a leading edge.

This deck allowed safe access across areas where the floor had been removed and also allowed for the safe installation of new flooring sheets, which could be slide underneath the platform and fixed down, before this is retracted, providing collective fall protection at all stages of the task.

To find out more, click the link below.

Go to resource


Footer Reference

Information provided by BAM Construction Ltd - Midlands


Did you find this article helpful?

Please rate this article

1 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 5 (1 votes, average: 5.00 out of 5)
You need to be a registered member to rate this.
Loading...

One thought on "Temporary Working Platform"

  1. Paddy Hughes says:

    Fantastic idea

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme