Rechargable Transformer for Temporary Site Electrics

To minimise the use of trailing leads on site, this contractor is using rechargeable transformers across the site for temporary electrics.

Operatives can easily transport the lightweight transformers to their workstations for the day.

These transformers can take 10,000 recharges in a life time with 1 charge and discharge per day.

This product is energy saving, using electricity smarter whilst also cutting costs.

Footer Reference

Information provided by Multiplex Construction Europe Ltd


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme