Entries by Ivan Conway

Tracked Dumper Machine Mounted Winch

Published 30 September 2020

Due to the difficult ground within the Beinn an Tuirc Phase 3 Windfarm, Roadbridge have acquired a


Surface Water Management Sludge Lagoon

Published 30 September 2020

To improve surface water management on Beinn an Tuirc Windfarm Phase 3, a large lagoon was built to


Emergency Contact Cards

Published 30 September 2020

This project in Campbeltown, Scotland is currently situated in a very remote part of the county.


Emergency 4×4 Vehicle

Published 30 September 2020

Due to the remote location of the Beinn An Tuirc Windfarm, the project team have put an emergency


Adult Resuscitation Kit

Published 29 September 2020

In light of the current coronavirus pandemic, Roadbridge have recently purchased adult


Back to Previous page