Entries by Jack Endean
Published 6 November 2023
Magnetic hooks are distributed around site, and are designed to hold loose cables above head
Published 6 November 2023
This contractor is utilising an 11.5m piling auger attached to a 50 ton excavator to carry out
Published 6 November 2023
This contractor worked with their tie rod manufacturer to devise an approach to the installation of
Published 6 November 2023
A cab heater has been installed to use during colder periods to reduce fuel consumption. The
Published 6 November 2023
With this project being an 1870's listed building, the skills shortage was even more apparent. The
Published 6 November 2023
Due to significant erosion to the embankments of the River Ely, the footbridge needed to be
Published 6 November 2023
This fuel digester encapsulates oil particles and prevents them from sticking to and landing on
Published 6 November 2023
On this project they have implemented the use of the Fire Safety Stick with the hot works permits
Published 6 November 2023
The project is using drainage kerbs made from recycled waste polymers, packaging, freezer bags and
Published 6 November 2023
In their efforts to reduce carbon on the project this contractor has researched various methods of
Published 6 November 2023
To move towards their Net Zero by 2030 goal, this contractor has deployed the Deep Green
Published 6 November 2023
A brand new in-house designed board with brief information on the Considerate Constructors Scheme
Published 6 November 2023
This project will be the first of it's kind to have a Biophilic façade. It refers to the
Published 6 November 2023
The Adamson 1 requires very little maintenance as it is made out of a lightweight blue material in
Published 10 October 2023
The construction site is challenged with pigeons - issues with nesting in the new build and