Entries by Sally Kinchin

Soundex Cutting Enclosure Trial

Published 20 April 2021

This contractor has assisted with product development and feedback of the Soundex Cutting


Recycled Old School Cubicles

Published 20 April 2021

Changing cubicles donated from an old school which had become redundant due to the school being


Plasloc System

Published 20 April 2021

To remain compliant with Site Operating Procedures, this project has used the Plasloc system due to


Environmentally Friendly Concrete Washout

Published 20 April 2021

A specially designed wash out skip was used in conjunction with concrete pump operations. The


Blocklocker

Published 20 April 2021

The boundary of this project has a range of live services running around the site boundary, so


Sponsorship of Road Safety Scheme

Published 19 January 2021

The project team at Langley Grammar School have sponsored the 'Outside your school' Road Safety


Bridges to Site to Adhere to Social Distancing Guidelines

Published 10 November 2020

On this project, the new teaching block is being built in the middle of the current school. The


Progress Photos on the Hoarding

Published 10 November 2020

The pedestrian entrance at this project has a long walkway to the site entrance turnstile. To


Riser Safe

Published 10 November 2020

This project has a fully integrated BIM model and have taken the opportunity to utilise the riser


Custom Made Excavator

Published 11 June 2018

The site team needed to construct a large basement on a confined site with difficult ground