Situated in a city centre, space has been an ongoing issue on the project.
The team have therefore invented and introduced a bespoke frame for holding 1 tonne bags that can be rolled around each floor area to aid contractors to remove their waste from the building to the canti-decks.
This has enabled the site to maintain high standards of housekeeping across the site despite the issues with space.
The bespoke frame was created as a resolution to on-going issues with housekeeping on site and has raised the standard of housekeeping even further on site. The rolling mechanism also ensures operatives do not pick the bag up, maintaining high safety standards.
Entry submitted by John Paul Construction