Built in Steel Work Lifting Eyes

Traditional methods of lifting steel frame beams allow for the lifting team to measure points across the steel beams and then secure their fixing clamps to steel work as designed for lifting into their final location.

This method is time consuming and requires inspections by the construction site team.

We now ask our steel work contractors to factor in lifting eyes on the design of steel beams which reduces setup time and can be simply lifted from the delivery lorries straight to the final location safely.

Footer Reference

Entry submitted by Kier Construction


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.