This contractor has implemented Cabin Pump, which is a portable, powerful, and tough wastewater macerating system for temporary and portable buildings.
This eliminated the need for the contractor to install an effluent tank in the ground that would need to be pumped out once a week via a lorry.
This initiative over a 5 month period will save over 250 waste tanker trips, which equates to more thank 2000kg CO2 emissions.
To find out more, click the link below.
Information provided by Morgan Sindall Construction & Infrastructure Ltd