On this project, they have implemented a significant initiative by installing two cruciform cranes within just two days.
These cranes are designed to sit on engineered concrete bases, meaning no piling works are required. This approach eliminates the need for piling, significantly reducing noise, vibration, and disruption to the surrounding community.
The cranes can be installed in a far quicker way than traditional methods, improving efficiency, safety, and environmental performance as well as reducing disruption to neighbours.
This method provides a modern, low-impact alternative to conventional crane installation, demonstrating forward-thinking construction practice.
Information provided by Winvic Construction Ltd