Drawings on Large Screens

During these times of change due to the pandemic we have been looking at ways to change.

We have 2 large screens one in the office and 1 onsite in a safe area.

This enable us to call up drawings on our laptops and from a safe distance these can be looked at with the Subcontractor using a mouse to point and look at details, dimensions etc.

The screens are used for inductions and toolbox talks.

This example of best practice is just one way that projects can work to tackle the virus and reduce the spread. For full guidance and the latest Government advice read the Construction Leadership Council’s Site Operating Procedures.

Footer Reference

Entry submitted by Morgan Sindall


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.