As a new way of transporting dry lining boards across site, a temporary works approved conveyor system was designed. It has rollers across the length of it, and spans from hoist run offs all the way to the work areas, across the 60cm high steel beams that are every 9m throughout site.
This allows dry lining workers to slide the board in a controlled way all the way to the work area with almost no need for manual handling thus lowering the number of injuries caused by this.
Each board weighing 34kg, and measuring 3m tall, 15mm thick.
Information provided by Lendlease Construction
The Scheme does not promote or endorse any products, goods or services. For more information, click here.