The timber frame extension to the existing school was chosen by the contractor as a pilot project for the introduction of new ‘flame free technology’ using the E-torch Max, that works in conjunction with Bauders self-adhesive system.

Only using hot air, the subcontractor quickly adapted their skills into using hot air for the entire installation process.

As with any timber frame building the risk of fire is of paramount concern, and this combining the need to drive down emissions. With the risk of fire, all but eliminated as the speed of the E-torch Max in drying and the lap fusing processes, the installation proceeded at a quick pace.

Using this system created zero emissions and used 20% of the energy compared with traditional propane methods.

Footer Reference

Information provided by Morgan Sindall Construction & Infrastructure Ltd


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme