Fast Beam is an innovative, safe and extremely productive bridge access system, enabling repair and construction works. From straight to curved bridges and platforms, it is specifically designed to minimise space and traffic disturbance.

The system is quicker to install than any other seen in the UK, with a three-man team being able to install 50 metres in an eight hour shift.

With the support of the BMV JV and Highways England, a VolkerLaser team installed the platform on the northbound parapet between junctions 1 and 2 of the M5. The system will remain in place for the next week to allow for a series of repair works to be undertaken.

To find out more, click the link below.

Go to resource


Footer Reference

Monitor Report. BMV JV. West Midlands. February 2019.


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme