The site used dewatering equipment that was installed with telemetry.
This means that any malfunctions with the float switch activation will result in an alert.
Any faults could result in serious flooding out of hours. However, the system is working 24/7 so if this did occur a response can be quickly organised.
This system has the potential to prevent large amounts of water from being wasted in the event of an emergency.
Monitor report. Northern Gas Networks. County Durham. September 2019.
The Scheme does not promote or endorse any products, goods or services. For more information, click here.