This contractor is utilising the gripple bracketry system for all electrical containment on the project.
Using this system they have saved an estimated 720 hours on site through efficiency, an estimated 2,408kg material weight and an estimated 5,466kg CO2 embodied carbon.
This eliminates hot works for cutting bracketry on site.