Individual Hazard Boards for Plant Operatives

Due to the logistics of the area and the site being ‘brownfield’, the site was split into three sections. Works were being carried out at separate stages on each section, so the Project Manager Sandy Haggart wanted to reinforce the daily hazards in each section to the plant operators working there.

In addition to a main hazard board for the whole site, each plant operator was provided with a separate ‘mini hazard board’, updated daily, which highlighted the hazards relevant to the section the plant operator was working in.

The hazard boards are mounted in the plant cabs and visible to the operator at all times.

Footer Reference

Entry submitted by Robertson Construction


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme