Steelwork was required in various locations throughout this tightly compacted residential home, including the formation of a new lower ground floor, rear terrace and installation of a central ‘stability frame’.
To help manoeuvre these steels weighing in at almost 400kg each into the building, industrial grade rollers on bearings were implemented.
Steels were delivered by hi-ab, positioned on rollers, and then freely manoeuvred into their respective positions.
This improved their unloading and distribution times, whilst minimising manual handling and importantly avoided associated injuries and muscular strains.
Information provided by Walter Lilly
The Scheme does not promote or endorse any products, goods or services. For more information, click here.