This contractor installed panels that are prefabricated in a controlled factory environment, ensuring high accuracy, zero weather delays, and superior quality compared to traditional on-site methods.
This enables construction of up to 15 storeys with installation rates of under two weeks per floor, significantly reducing project timelines, as well as accommodating complex architectural features such as balconies, cantilevers, pitched or flat roofs, and works with various external finishes.
This process generates zero waste, offers a low carbon footprint, and integrates high thermal, fire, and acoustic performance for energy-efficient buildings.
To find out more, click the link below.
Information provided by Multiplex Construction Europe Ltd
The Scheme does not promote or endorse any products, goods or services. For more information, click here.