The office of this project has now been connected to the permanent solar panels on the roof of the block that facilitates the temporary office.

This is the first instance for this company where the permanent installation of solar panels was accelerated in order to supply a temporary office and as a result, they are able to predominantly run off solar panels in the summer months.

This has resulted in a far lower energy usage for the office than would usually occur as well as substantial savings in cost.

Footer Reference

Information provided by Berkeley St Edward


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme