The office of this project has now been connected to the permanent solar panels on the roof of the block that facilitates the temporary office.
This is the first instance for this company where the permanent installation of solar panels was accelerated in order to supply a temporary office and as a result, they are able to predominantly run off solar panels in the summer months.
This has resulted in a far lower energy usage for the office than would usually occur as well as substantial savings in cost.
Information provided by Berkeley St Edward