Working at height will always be a high risk activity.

Many different techniques and technologies are constantly being developed to reduce the risk of injury on site.

The example below demonstrates how one site achieved this:

  • With nearly 700 metres of bulkheads and a soffit height of 4.7m, a prefabricated solution has been devised to dramatically reduce the amount of time needed to work at height.
  • In 2.4m lengths, all board joints have been engineered with jigsaw locking detail and an edge trim which has totally removed the need for plastering, so only need decoration once erected.

Footer Reference

Monitor report. Kier Construction - Major Projects. Cambridgeshire. December 2016


Did you find this article helpful?

Please rate this article

1 vote, average: 4.00 out of 51 vote, average: 4.00 out of 51 vote, average: 4.00 out of 51 vote, average: 4.00 out of 51 vote, average: 4.00 out of 5 (1 votes, average: 4.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.