Screen Safe System

At Symons House, RG Group introduced an initiative adaption of a screen system to change tie positions so that the lower slab was clear of screen ties, allowing the safe installation of Metsec, cement boards and windows and seal the system within the screen.

This enables safe execution, especially in the adaption of the screen safe system for the high-level works to the main tower block.

This methodology has eliminated work at height for 80% of the external envelop contractors and has significantly increased public and operative safety for everyone below the system.

In recognition, Faithful and Gould have put the project forward for a safety innovation award based around this screen.

Footer Reference

Monitor Report. RG Group. Leeds. August 2018.


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.