Self-Climbing Facade

Ardmore are working on site at Commercial Road, Aldgate East to erect a 21 storey apart-hotel to include a two floor basement in within close proximity of London’s vibrant Shoreditch.

Ardmore have worked closely with ISHBECK TITAN to create a new self-climbing façade to protect their workforce, environment and the general public. It has taken the company 18 months alongside the supplier to ensure this new system was ready to go.

  • Makes the façade works safe for workers in challenging weather conditions, protecting them from high winds, rain, gust.
  • Safer for members of public passing our project.
  • Reduces carbon footprint by replacing scaffold systems.
  • Reduction on deliveries compared with scaffold systems.
  • Provides a good working environment for the workforce, warm, dry, easy to walk along.
  • Is considerate of the public, containing noise and dust.
  • Commercially efficient.
  • Labour cost efficient.
  • Material cost efficient.
  • Can be re-used on further projects.
  • Reduces intrusion for our neighbours.
  • As it takes up to 10 minutes to move up floors, it helps reduce the time it would take scaffold solutions to do, therefore speeding up programme delivery.
  • Reduces crane time usage cutting in fuel costs and pollution to the environment.

Footer Reference

Entry submitted by Ardmore.


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.