Site efficiency to ensure positive appearance

At our site comprising 9 flats for a local housing association in Kent, because of the amount of space available on this site and being right next to a primary school, we decided to carry out all the drainage, ducting and entrance road before brickwork commenced.

By preparing the perimeter of the building and other areas, we are hoping to be in more control of the dust and become a nearly mud free site.

Also, by preparing the area first we do not having to spray the site down as much.

Because of the lack of storage, delivery of bricks and blocks are booked in on a weekly basis.

Footer Reference

Entry submitted by Jenner Contractors


0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this post.
Loading...


Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.