The ‘Road to Safety’ Board

At Wandsworth Riverside Quarter we’ve designed a ‘Road to Safety’ board to highlight all the site specific requirements for our project.

The board highlights the following;

  • Induction process
  • RAMS understanding
  • Competency card for the relevant task
  • Correct tools for the job
  • Permit in place (if required)
  • Open door policy
  • Challenging Beliefs Affecting Behaviour
  • CCS registration
  • CLOCS registration
  • Plant Movement/ Traffic Marshall
  • First Aiders
  • ROSPA recognition
  • Mental Heath First Aider
  • Protecting the local environment

This is also used as an induction site tool to discuss all topics with new operatives and use the tool as visual guidance.

Footer Reference

Entry submitted by Galliford Try


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.