This contractor is using this device to remotely control the position of a suspended load without the need for tag lines.
Using in built GPS sensors it will also hold a suspended load in a set position without needing operator engagement.
The device removes the need for a banksperson to be close to a suspended load or hold a tag line. Using the hierarchy of risk control ‘ERICPD’ this device enables the the project to eliminate the need to put persons at risk working close to a suspended load.
To find out more, click the link below.
Monitor Report. Kier Construction. Bedfordshire. January 2024.
The Scheme does not promote or endorse any products, goods or services. For more information, click here.