Whiteboard Traffic Management Plan

Halsall Construction Health and Safety Policy has always included the use of hazard boards on our projects. This has now morphed into a Traffic Management Plan. The board is placed on the wall above the signing-in register.

An overall plan of the site is printed onto a magnetic white board. The site team can easily update and revise the board as and when appropriate.

There are various magnetic symbols as highlighted on the legend on the left hand side which can be placed where required. Traffic & pedestrian routes are drawn in and recycling, material storage, prohibited areas, loading bays etc. can all be identified.

Footer Reference

Entry submitted by Halsall Construction


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme