Tags
Published 23 March 2026
To maintain passenger access between platforms 1 and 2 during the station upgrade works at
Published 23 March 2026
This contractor has implemented a digital torque wrench which delivers up to 50% faster
Published 23 March 2026
This contractor installed panels that are prefabricated in a controlled factory environment,
Published 23 March 2026
On this project, the team replaced traditional concrete blinding with Dufaylite Clayboard, a 100%
Published 23 March 2026
In several locations, the newly constructed flood wall ties in to Penwortham Old Bridge, a Grade II
Published 23 March 2026
On this project, the existing football pitch, made of heavy clay subsoil, was repurposed as a
Published 23 March 2026
To minimise excavation for both the piling mat and the haul road, Tensar geogrid was utilised to
Published 11 March 2026
The purpose of this Site Visitor Induction Template is to ensure that all visitors are informed of
Published 4 March 2026
The project is in a high-crime area, posing challenges for the local community. As a major
Published 4 March 2026
This contractor has deployed AI-powered edge computing cameras across the entire 80km worksite to
Published 4 March 2026
On this project they have partnered with Kitt Medical to provide a comprehensive Anaphylaxis Kitt
Published 4 March 2026
On this project they are using the CoverMe Hole Cover, an industry-first adaptable multi use
Published 4 March 2026
This contractor has implemented a new edge shutter system which is aimed to replace the traditional
Published 4 March 2026
This contractor has partnered with social enterprise Prima Materia to turn phased demolition into a
Published 4 March 2026
On this project they are working directly with the Great Ormond Street Hospital (GOSH) to deliver a