Creating an ‘EcoPatch’ with School Children

Published 2 December 2019

Pupils from a Hereford primary school swapped the classroom for a construction site when they


Waste Water Heater

Published 2 December 2019

The site team have installed a system in their welfare facilities which uses reclaimed heat,


Safety System for Crane Drivers

Published 2 December 2019

The site team have installed an innovative safety feature onto their Wolff Luffing Jib Tower Crane.


Hydraulic Punch Driver

Published 2 December 2019

The site are using a battery powered hydraulic punch driver. It has an aluminium head which is


Punjabi Language MEWP Test

Published 2 December 2019

The site encountered a problem with Punjabi speaking concrete workers failing the MEWP


Safety Conversation Starters

Published 2 December 2019

BAM Construction's Capital Square Office Development in Edinburgh has introduced Safety


LED Stop and Go Boards

Published 2 December 2019

The site have incorporated LED illuminated manual stop and go boards. These provide many


Bogus Caller Reminder

Published 2 December 2019

During the initial resident interview, the Resident Liaison Officer talks the householders through


Silt Bag System for Site Water Run Off

Published 25 November 2019

Following the enabling works to the site, it was discovered that the site was accumulating surface


Avoiding Disruption to Public Transport

Published 25 November 2019

The Leeds Public Transport Investment Programme (LPTIP) on the Headrow project saw the start of the


Shout5

Published 25 November 2019

Shout5 is an initiative in which during the working day, an egg timer is started on site. In the


Tackling Hate Crime at Work

Published 25 November 2019

The Police and Crime Commissioner, together with the Safer North Hampshire Partnership and


Community Provided Artwork for Hoarding

Published 25 November 2019

On the A23 in Streatham near its southern boundary with Norbury, Harmonix Construction have


Green Route Matting

Published 25 November 2019

Typically, our green routes were marked out with spray painted arrows. However, after


RSA Shuttle and Roll Over Simulator

Published 25 November 2019

The RSA (Road Safety Authority) shuttle is an interactive educational unit, which was brought to