Utilising a Drone with Propeller Analysis for BIM

Published 14 August 2025

This contractor implemented 3D digital modelling (BIM) to map out the complex coastal terrain and


Spacebands – Wearable Technology

Published 14 August 2025

This contractor has implemented Spacebands wearable technology to monitor exposure to HAVS and loud


Seat Assistance Stand For Reduction In Musculoskeletal Injuries

Published 14 August 2025

On this project, the flooring contractor has developed a piece of equipment to assist them with


Remote Movement Monitoring

Published 14 August 2025

Due to the location of this project, there is a river and river wall to one elevation and Network


Precast Facade and Post Tensioned Slabs

Published 14 August 2025

To reduce its carbon footprint, this contractor has implemented precast facades made with low


Neurodiversity Inclusion Project

Published 14 August 2025

This contractor has invited a range of groups representing people with neurodiversity, mental and


Probst Vacuum Lifter

Published 14 August 2025

This contractor have used a vacuum lifter which avoids the needs for manual handling when kerbing.


Location360

Published 14 August 2025

Traditionally for rail works within tunnels, the contractor would have deployed site staff to


Lighter Scaffold Tubes

Published 14 August 2025

While the industry standard is 4.0mm scaffold tubes, this contractor and their scaffolding


Legato Blocks to Assist Dewatering

Published 14 August 2025

Due to the nature of the works, the project needed to dewater the dock to proceed with works, but


Knife Crime Matters Campaign

Published 14 August 2025

The Knife Crime Matters construction site banner campaign aims to raise public awareness of knife


Human Vue Detection System

Published 14 August 2025

This contractor has implemented the use of the Human Vue detection system on their telehandler


Building Management Systems installed in Site Welfare and Offices

Published 14 August 2025

This contractor has implemented Building Management Systems (BMS) within the site, these track and


Biodegradable Silt Mats

Published 14 August 2025

On this project, biodegradable silt mats have been placed across the swales that traverse the site


Digital Diversion

Published 14 August 2025

This contractor used 'Digital Diversion' to track the time in seconds it took a vehicle to take the