Entries by Jack Endean

Prefabricated and Preinstalled Plant Room Kiosks

Published 4 April 2024

Early engagement with the client identified concerns over the social and environmental impact that


Pile Strain Monitoring

Published 4 April 2024

The project team are involved in a joint venture, in an element of research to measure the load


Out Of Hours Energy Consumption Alarms

Published 4 April 2024

This contractor is tackling operational carbon through the utilisation of an energy monitoring


New Mum and Baby Packs

Published 4 April 2024

This contractor collaborated with residents, local businesses and internal staff to create new mum


Neurodiversity Workshop

Published 4 April 2024

Neurodiversity is a subject that the Social Value Manager of this project is passionate about, and


Monkey Tower Scaffold

Published 4 April 2024

On this project, works at height had to be carried above existing lab benching. To carry this work


Lift Shaft Construction

Published 4 April 2024

The project team are working with the lift and concrete frame contractor to develop an innovative


Immersive Room

Published 4 April 2024

This contractor is using a state of the art immersive room on this project. Working in


Hydrocarbon Barrier

Published 4 April 2024

This project's marine licence requires site to stop construction spills from entering the marine


Gripple Bracketry System

Published 4 April 2024

This contractor is utilising the gripple bracketry system for all electrical containment on the


Electric Arc Furnace Recycled Steel

Published 4 April 2024

The project team worked collaboratively with the client to discuss ways to generate carbon


Digital Scaffolding Inspections

Published 4 April 2024

This contractor is using Inspect 7 which is a digital scaffolding inspection system. This uses a


Diabetes – Safety in the Workplace

Published 4 April 2024

This contractor has implemented a diabetes safety in the workplace training course which provides


Construction Site Open Day

Published 4 April 2024

During the early stages of this project the contractor noted that the local area was plagued with


Co-extrusion Windows

Published 4 April 2024

This contractor sourced a supplier that produces co-extruded top-quality window profiles, enabling