Tags
Published 9 July 2025
This contractor has implemented smart silos which provide live measurement of levels, ensuring
Published 9 July 2025
This contractor has introduced the CTL702-32 cranes to their fleet, this is a 32-tonne capacity
Published 9 July 2025
This contractor implemented retractable traffic cone bars, these are very simple to use and easy to
Published 9 July 2025
Minuendo Smart Alert is a safety device designed to protect those exposed to noise from potential
Published 9 July 2025
In both tower cranes on site, they have implemented pedal operated crane radios, with external
Published 9 July 2025
This contractor has engaged the use of a manhole ring lifter, which works similar to a block
Published 9 July 2025
This contractor has used a dredger powered by liquefied natural gas (LNG). Making this choice
Published 9 July 2025
On this project they have dedicated an onsite facility to provide platform for increasing capacity
Published 9 July 2025
Traditional tyres are vulnerable to punctures which then leads to frequent replacements. Therefore
Published 9 July 2025
This contractor introduced electric stair climbers and competent operators to support the safe
Published 9 July 2025
As part of their ongoing commitment to health and safety, this contractor has introduced a burns
Published 9 July 2025
This contractor is using a decorative 'Wallcast' system which consists of a unique and rigid column
Published 9 July 2025
On this project they are utilising COMET AI, an advanced Health, Safety, and Environment analytics
Published 8 July 2025
This contractor developed a modified drift pin, which is used during pipeline installation. The
Published 3 July 2025
This contractor has used modular temporary bracing systems that are fully reusable and adaptable