Due to utilities issues on the road, this contractors design and construction teams have had to review how they can prop and jack the crosshead.

Due to the close proximity of major services in the vicinity they could not install a standard propping system design, so they have had to think outside the box and came up with a collar solution.

This solution involved adapting the strengthening works of the existing column and foundation required at this location to accommodate the collar solution. This involved using a bespoke shuttering solution purposely built for this design.

Due to these changes they were able to carry this work out in a 8 week period.

Footer Reference

Information provided by Amey


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme