taxonomy.php
Litter – What is the problem? The appearance and condition of a construction site and its perimeter is often the first, only and lasting impression that members of the public who live and work around the activity have of the construction industry. The Considerate Constructors Scheme regularly receives complaints regarding litter on and around construction projects. This instalment of Resolving…
Situated in a city centre, space has been an ongoing issue on the project. The team have therefore invented and introduced a bespoke frame for holding 1 tonne bags that can be rolled around each floor area to aid contractors to remove their waste from the building to the canti-decks. This has enabled the site to maintain high standards of…
Litter Heroes have been identified to promote a clean working environment and report observations relating to waste management to the Environmental Team. The initiatives aim is to promote an awareness to their impact on the local environment and ensure they maintain their wider site area. Staff representatives from every department make up the Litter Heroes network. The objective is to…
Due to a lack of public recycling bins around the site and within the local Southwark area generally, we decided to provide this facility ourselves by incorporating a ‘Public Recycling Zone’ within the hoarding on our most trafficked street – Stamford Street. This enables passing members of the public to recycle their waste through the different slots into a compartmentalised…