taxonomy.php
As the Lillie Square project was evolving from superstructure and cladding towards utilising fit-out trades, the project held a ‘managing fit-out waste workshop’ with subcontractors. The purpose of the session was to help raise awareness about the importance of waste on the project and to also discuss ways in which waste could be reduced. The workshop covered a number of…
Weekly UAV surveys are carried out using a DJI Mavic 3E quadcopter type drone equipped with an RTK module. Together with ground control points, this allows an extremely accurate aerial survey to be carried out. The site extents are programmed into the aircraft allowing it to generate a flight path which it automatically flies in around 10 minutes from take-off…