Met Frame Construction

This contractor installed panels that are prefabricated in a controlled factory environment, ensuring high accuracy, zero weather delays, and superior quality compared to traditional on-site methods.

This enables construction of up to 15 storeys with installation rates of under two weeks per floor, significantly reducing project timelines, as well as accommodating complex architectural features such as balconies, cantilevers, pitched or flat roofs, and works with various external finishes.

This process generates zero waste, offers a low carbon footprint, and integrates high thermal, fire, and acoustic performance for energy-efficient buildings.

To find out more, click the link below.

Go to resource


Footer Reference

Information provided by Multiplex Construction Europe Ltd


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme