To engage better with the workforce and improve feedback, the EARPS team purchased a set of voting


Hybrid Tandem Roller

Published 26 May 2020

The A46 Upgrade & Anstey Lane Widening contract are currently using a Bomag BW 174 AP hybrid


Flexipave Recycled Surfacing Material

Published 26 May 2020

Morgan Sindall at the Network Rail Werrington Grade Separation project in Peterborough have


Sustainable Hoarding Solution – EnviroHoard™

Published 26 May 2020

At the Royal Brompton Hospital, Kier Construction London as a way of implementing closed loop


Building Better Health Initiative

Published 26 May 2020

Our site team on our Bedford Square Belfast project recently implemented a site Health &


Workforce Engagement

Published 18 May 2020

The A46 Anstey project team were challenged to find a simple but effective method to establish if


Safe Resident Access Points

Published 18 May 2020

When undertaking surfacing works on existing roads it is often necessary to block off service roads


Upcycling Materials

Published 18 May 2020

Wanting to enhance the appearance of our site and provide pleasant outdoor rest areas for our


Online Training as Part of a #stayconnected Campaign

Published 18 May 2020

As part of our #Stayconnected campaign we developed an online training package for staff away from


Social Distancing Guidance Hi-viz Waistcoats

Published 18 May 2020

At Westvale Park Primary Academy project and in line with Public Health England Guidelines on


Rebar Cages Onsite Prefabrication Jig

Published 12 May 2020

To achieve better production rates on the roof slab of the Kilo Substructure, Ferrovial Agroman


An Improvement to Woodpole Construction

Published 12 May 2020

In December 2019 there was a communication sent across Power T&D with regards to an incident


Using Mannequins to Ensure Operatives Know the Correct PPE for Each Task

Published 12 May 2020

The complexity of the various project activities creates the need to ensure an operative has a


Real Time Point of Contact Mission Room

Published 12 May 2020

The mission room system has been extended by including a real-time point of contact for each team


Autism Friendly Road Signage

Published 12 May 2020

Workshops were held on site raising the awareness of autism, extending to the mental health first