The team on this project wanted to address the potential risk of vehicles leaving works entrances
Published 13 January 2022
On this project the new road cuts through areas of peat which is waterlogged and operations in this
Published 13 January 2022
During the monthly workforce consultation meetings, one of the site operatives suggested the
Published 13 January 2022
On this project they received the new Eco Hybrid Lithium welfare cabin with increased lithium
Published 13 January 2022
Certified Water Stewardship training through Irish Water and the Lean & Green Skillnet was
Published 13 January 2022
Temporary lift shaft doors are installed after completion of the RC shaft to ensure that lift
Published 13 January 2022
On this project, operatives on site came up with a solution to moving mass barriers. The attachment
Published 13 January 2022
This is a working at height proposal to install a clamp at high level on the pylon allowing
Published 20 December 2021
Having had other projects where mud on the roads was an issue, the client asked the contractor to
Published 20 December 2021
This contractor is working with their subcontractors to meet their One Decade to Act goal of zero
Published 20 December 2021
This site was keen to get public feedback from those who were passing their site but on previous
Published 20 December 2021
An existing two lane dual carriageway was widened to three lanes in both directions, by borrowing
Published 20 December 2021
This contractor is attempting to provide an approach to mental health and wellbeing support to
Published 20 December 2021
This contractor arranged for Cash For Kids clothing and textile banks to be delivered to the site
Published 20 December 2021
This contractor believe all women should have access to sanitary products during their period