Electric vehicles

Syntec Fuel

To protect the 80,000 trees that have already been planted and allow them to establish, this contractor installed 6196m of fencing using a Cobalt Plant excavator which runs off Syntec fuel. This type of fuel is a suitable alternative to diesel and HVO, therefore aligning to the projects strategy to deliver using diesel-free construction. The team are also using an…


Electric Remote Controlled Articulated Trailer Mover

On this project they had a number of trailers on site as part of an expansive logistics operation whereby a number of HGV trailers were delivered to the project simultaneously from overseas process teams and vendors. Working in partnership with the clients logistics team they reviewed options to manage a large quantity of HGV trailers. The team procured smart technology…


Potassium Acetate Crystals for Gritting

Salt grit has been replaced with potassium acetate crystals on the deck. This is distributed using a hopper towed by an electric van (powered with 100% renewable energy). To enable this, council gritters stop spreading when they reach the bridge. The contractor uses MetDesk to receive their own weather alerts to know when they need to apply the crystals. Potassium…


Electric Van for the Survey Team

During the month of May the Bermondsey Survey team took delivery of a Renault Kangoo Electric Van. The van, which charges off a standard plug socket, has been a great tool in helping to reduce the team’s emissions and costs, as well as offering a greener mode of transport for all of the other travelling team members. The financial benefit against…


Battery Powered Heavy Duty Pallet Truck

The project is using a battery powered heavy duty pallet truck to move materials around site, in place of the diesel powered telehandler. The pallet truck has pneumatic tyres enabling it to travel over relatively rough terrain. Using battery operated plant helps to reduce the site’s carbon emissions. The pallet truck is also used to move materials within the building,…


Electric Ready-Mix Concrete Mixer

This contractor used an all-electric ready-mix concrete mixer on their project, helping them significantly on their path to net zero construction. The mixer, created in partnership with Renault Trucks and TVS Interfleet, is the first of its kind to operate anywhere in the UK with zero tailpipe emissions. This mixer has the same average capacity as a conventional diesel vehicle,…


Electric Crusher

To reduce vehicle movements to and from site and improve their carbon footprint, this contractor has engaged with a supplier to use an electric crusher on site for the re-use of material. Noise, dust and vibration is at an absolute minimum in comparison to using a fully diesel generator operated crusher. To find out more, click the link below.


Electric Multi Service Vehicles

Electric Multi Service Vehicles (MSV’s) are being used as opposed to diesel or track-bound vehicles on this project. These vehicles will be used to transport segments for the TBM as well as people along the tunnels within the project. Electric (MSV’s) will help the contractor reach their ‘Diesel free by 2023’ status and they are aiming to become the leader…


Pod Point Electric Vehicle Charger

An Electric Vehicle (EV) charger that can moved moved from site to site without the need for installation by a specific supplier. Most EV charging points are installed by suppliers and fixed on site to be removed at the end of a project. This Pod Point is fixed on a transportable mount and uses a plug and play electrical connection…


Site Accessibility and Keeping up with the Electric Vehicle World

With more visitors and local authority clients coming to this project it is important that they ensure we cater for all with accessible parking, meeting rooms and toilets. Additionally with the increase of electric and hybrid vehicles, they now offer a free ‘top up’ for visitors car while they are at the project.


Zero Emissions Electric Crane

This contractor is using the new Liebherr LR1160E Electric crane on their Canterbury Works Vent shaft site. This site requires the utilisation of a crane for a large portion of the works. There are two options for this requirement which are the HSC SCX1500A-3 Diesel Crane and the Liebherr LR1160E Electric Crane. The comparisons between these cranes can be seen…


Use of Electric and Hybrid Vehicles

To reduce carbon emissions all company cars are now electric and there has been in-depth research undertaken on the availability of hybrid or all electric vans. This has eliminated over 30,000kg Co2 emissions a year on company cars. A route for purchasing electric vans has been sourced which will have a significant impact on emissions as the fleet is around…


Remote Controlled Electric Breaker

At Mace’s GPE Hanover Square Project, J Coffey Construction Ltd used a ‘Brokk 260’ remote controlled electric powered breaker to substitute a more traditional diesel powered breaker, used for breaking out concrete. Sustainability benefits include: Reduced carbon emissions – as electricity at Hanover Square is sourced from a 100% renewable supplier (Ecotricity), electrical breakers have zero carbon emissions. Reduced pollution…


Electric Concrete Pump

The Royal Albert Hall project is utilising an electric concrete pump on site to help minimise environmental impacts. The pump uses a rotating screw to pump the concrete down the lines as opposed to a traditional piston pump which can be noisy. The pump not only reduces carbon emissions compared with traditional alternatives, it also improves the air quality of…


Best Practice Hub
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible.

Cookies are small pieces of text sent to your web browser by a website you visit. A cookie file is stored in your web browser and allows the site or a third-party to recognise you and make your next visit easier and the website more useful to you.

Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

We only use cookies to improve your experience and monitor web traffic. All data we collect on this site is anonymous and not shared or sold. Please find more information here

The Best Practice Hub is provided by the Considerate Constructors Scheme