taxonomy.php

Specialist input

Barking Barrier Silt Capture

The project involves removing and reapplying the protective coating on the Barking Creek Barrier. To protect the River Roding from contamination, a customised, fully encapsulated hanging scaffold with a uniquely efficient drainage system has been created and installed. The barrier is still active, so the works are put together in a way that allows them to remove the system in…


3G Pitch Shock Pad Upcycling

Initially this contractor was required to uplift the existing 3G pitch and shock pad and this material was due to be transported to landfill. Because this had to be taken to a certain landfill site they enquired about alternative means of disposal/reuse, receiving very little feedback on alternatives. They worked with the supply chain and approached clients with a proposal….


Jersey Cudweed

45 Millharbour is one of the few sites in the UK that contains Jersey Cudweed – a protected species of wild plant which was found growing naturally on the site prior to the project commencing. In order to protect this species, the project team set up an action plan with an ecologist from Greengage to ensure that the plant was…


GreenTheUK

GreenTheUK are a Scheme Supporter and an organisation that supports UK wildlife projects, delivering a measurable local impact and compelling marketing story for organisations. They will assist your organisation with supporting the growth of a conservation project local to the business. Share real-life results, rooted in your community, with your customers and employees. A dashboard is created for organisations showcasing a…


Water Treatment and Monitoring

Water monitoring for suspended solids and basic chemistry is common practice across construction but due to sensitivity of the environment (working above source protection zone 1), this contractor implemented a detailed water monitoring plan to analyse a larger suite of physical and chemical parameters (>50 individual parameters per sample) than required by environmental consents. Almost 8000 samples have been collected…


Clean Air Spray to Improve Air Quality

The project team has partnered with Clean Air licensees and graphics specialist, Iconic Display, to undertake a year long trial of the Resysten’s ‘Clean Air’ anti-pollution coating. The spray applied coating has been applied to a series of printed mesh banners and hoarding at the site entrance with air measurement technology also deployed to assess the breakdown level of harmful…


British Trust for Ornithology Mapping

Sites have a responsibility to manage the environment. Construction sites can cause disturbance to the local ecosystem both during and long after completion. It is therefore important to manage this issue and reduce the impact as much as possible. Sites should even further their actions and help enhance the environment, supporting the local area in the future. The below example…


Achieving Project FSC Certification at 5 Broadgate

To provide a validated chain of custody for timber materials from source to site, Mace worked with the client, architect and design team at 5 Broadgate to achieve Project FSC Certification. This was undertaken voluntarily, beyond original sustainability requirements specified for the project. Project FSC certification represents best practice in responsible sourcing of timber, as at the end of 2015,…


Automating Measurement of Pre Coated Chippings on Hot Rolled Asphalt

The contractor team had noticed an increased demand for hot rolled asphalt with pre coated chippings by clients as a long term surfacing solution for highways. Whilst undoubtedly a strong product, measuring the spread rate of pre coated chippings, a key element of the hot rolled asphalt process, can be time-consuming, dangerous, inaccurate, inefficient, and costly. Poor measurement can lead…


Certified Reduction in VOC Emissions

As part of their sustainability responsibility on this project and their desire for the healthiest workplace for their employees, the contractor set out to investigate the range of available low emitting raw materials, adhesives, finishes and finishing products and put these together to provide a certified method for achieving low emitting veneered and painted panels. These emissions include recognised prolonged…


Luxury Vinyl Flooring Take Back Scheme

On this project, they contacted the supplier to ask if they could do a luxury vinyl flooring take back scheme, as they had never completed this previously. This is the first vinyl take back scheme that the supplier have completed in the UK. To assist the supplier with this the contractor is commercially funding the take back scheme with the…


Falconry Used for Pest Control

We are refurbishing the former Royal Mail Building in Liverpool city centre for Liverpool John Moores University.  The building has been vacant for 5 years, and during this time has had seagulls nesting on the roof. Our scope of works includes roof works, and we therefore needed to prevent any nesting during the nesting season due to seagulls becoming very…


Spider Excavator with EMV Attachment

Working on an existing embankment with restricted working room behind residential properties, meant the installation of a traditional piling mat was not feasible without significant land take of the rear gardens of the residential properties. Traditionally for these piling works the contractor would install a pile mate and use a 14t tracked excavator with an EMV attachment. Therefore, the contractor…


Testing VOC’s to Create Two UK Firsts

On this project, the client had the vision to produce the worlds healthiest workplace and to do that they need to push the boundaries of what is acceptable further than ever before. The contractor challenged their supply chain to see how they can achieve this whilst maintaining all heath and safety building control standards. They have two products that have…


Galvanised Corrosion Cleaning Product

This contractor work with a specialist supplier to developed a solution that removed the white corrosion from the galvanised MEP first fix. The solution was to use a rock salt de-icer, rather than an ice melt chemical de-icer. This de-icer was used to de-ice the buffalo board to the southern gantry. The contractor and specialist contractor then undertook trials to…


Best Practice Hub
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible.

Cookies are small pieces of text sent to your web browser by a website you visit. A cookie file is stored in your web browser and allows the site or a third-party to recognise you and make your next visit easier and the website more useful to you.

Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

We only use cookies to improve your experience and monitor web traffic. All data we collect on this site is anonymous and not shared or sold. Please find more information here

The Best Practice Hub is provided by the Considerate Constructors Scheme