Green and Red Door System

Site personnel, inductees and visitors access the project via site entrance and make their way down to the lower ground level and use a link corridor to access offices and welfare facilities.

In order to warn people, the project team have implemented a green and red door system

Red doors have been designated to warn about access to the live construction area and mandatory use of PPE, green doors have been designated to warn about access to green routes and No material/equipment movement.

Logistics plans will be displayed at site entrance and security office.

Footer Reference

Entry submitted by Multiplex


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme