HEIC Groud Compaction

This contractor opted for ground compaction at their buildings and minor enhancements maintenance delivery unit (MDU) project.

This method involves repeatedly applying external forces to compact soil to increase its physical properties such as strength and stability.

This method reduces embodied carbon, utilising the site’s existing soil significantly lowers the carbon footprint. Piling involves materials like steel and concrete, which have high embodied carbon due to their manufacturing processes.

It is calculated to have saved 143,923kg of C02 on this project compared to the original piling scheme.

To find out more, click the link below.

Go to resource


Footer Reference

Information provided by Henry Boot Construction Ltd


Did you find this article helpful?

Please rate this article

0 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 50 votes, average: 0.00 out of 5 (0 votes, average: 0.00 out of 5)
You need to be a registered member to rate this.
Loading...

Leave a comment

Return to previous page

The Scheme does not promote or endorse any products, goods or services. For more information, click here.

The Best Practice Hub is provided by the Considerate Constructors Scheme