Entries by Jack Endean

Interactive Electronic Residents Pack

Published 5 May 2021

As a means of overcoming the poor image of the industry the typical handover and aftercare


Intelliframe System

Published 5 May 2021

The contractor has started to utilise the Intelliframe system which is utilised on the non-motorway


Improving Visibility for Wheelchair Users

Published 5 May 2021

The base of the scaffolding on the front elevation of the building has been built off the public


Enviro Wheel Wash

Published 5 May 2021

On this enabling works project, the site team are using an Enviro Wheel Wash. The Enviro wheel


Operative e-learning Hub

Published 8 March 2021

The contractor has created an e-learning hub positioned on site which enables workers to take the


Electric Heater used to Eradicate Propane Gas

Published 8 March 2021

This contractor have been using an electric heater has been developed in order to eradicate the use


Collision Avoidance System

Published 8 March 2021

The contractor is working with Safety Shield to trial and install their technology in their


WaveWalker

Published 22 February 2021

The WaveWalker is a modified jack up barge, which is capable of manoeuvring under its own power and


Use of Drone Mounted Camera and Thermal Imaging to Detect Skylark Nests

Published 22 February 2021

This project is situated on a large greenfield site with surrounding woodland and is an ideal site


Special Needs Local School Catering for the Site

Published 22 February 2021

The contractor were keen to make links to the local surrounding schools and charitable


Services Avoidance and Surveying Equipment

Published 22 February 2021

This contractor has put into use new services avoidance and surveying equipment the Leica DD


Precast Floor ‘U-Slab’

Published 22 February 2021

An opportunity arose to demonstrate a bespoke integration of structure and MEP services during the


Pre Serviced Walls

Published 22 February 2021

On this project they are using pre serviced walls across several of the floors. These are walls


Geopura Hydrogen Generator

Published 22 February 2021

The contractor are in discussion with Geopura to bring a new hydrogen generator to site to replace


Video RAMS and Inspection and Test Plans

Published 22 February 2021

The industry have moved on from traditional paper RAMS and Inspection & Test Plans (ITP) to


Back to Previous page

The Best Practice Hub is provided by the Considerate Constructors Scheme