Entries by Jack Endean
Published 5 May 2021
As a means of overcoming the poor image of the industry the typical handover and aftercare
Published 5 May 2021
The contractor has started to utilise the Intelliframe system which is utilised on the non-motorway
Published 5 May 2021
The base of the scaffolding on the front elevation of the building has been built off the public
Published 5 May 2021
On this enabling works project, the site team are using an Enviro Wheel Wash. The Enviro wheel
Published 8 March 2021
The contractor has created an e-learning hub positioned on site which enables workers to take the
Published 8 March 2021
This contractor have been using an electric heater has been developed in order to eradicate the use
Published 8 March 2021
The contractor is working with Safety Shield to trial and install their technology in their
Published 22 February 2021
The WaveWalker is a modified jack up barge, which is capable of manoeuvring under its own power and
Published 22 February 2021
This project is situated on a large greenfield site with surrounding woodland and is an ideal site
Published 22 February 2021
The contractor were keen to make links to the local surrounding schools and charitable
Published 22 February 2021
This contractor has put into use new services avoidance and surveying equipment the Leica DD
Published 22 February 2021
An opportunity arose to demonstrate a bespoke integration of structure and MEP services during the
Published 22 February 2021
On this project they are using pre serviced walls across several of the floors. These are walls
Published 22 February 2021
The contractor are in discussion with Geopura to bring a new hydrogen generator to site to replace
Published 22 February 2021
The industry have moved on from traditional paper RAMS and Inspection & Test Plans (ITP) to