Entries by Jack Endean
Published 14 December 2020
The project team used innovative design and worked collaboratively with key members of the supply
Published 14 December 2020
The contractor is trialling an Ecolite Lighting Tower, which is hydrogen fuel cell powered and
Published 14 December 2020
The site team are utilising a simple but very effective dust catching device for drilling into
Published 14 December 2020
This site has around 1000 operatives onsite with the majority of them involved in fit out
Published 3 December 2020
The Construction Leadership Council has updated its Industry Card Schemes recommendation which
Published 2 November 2020
The 'Work Pack' strategy employed on the project actively encourages workforce and separate trade
Published 2 November 2020
A 3D printer was used to produce 600 adjustable straps to permit the wearing of normal ear strap
Published 2 November 2020
As part of the scope of works on the Ferrybridge site there are 3 pipe bridges to remove, one of
Published 2 November 2020
Specifically designed and developed multi building engineering services panels have been fitted
Published 2 November 2020
Although constant automated monitoring of external conditions is carried out, there has been a
Published 2 November 2020
Two fire extinguishers are used on site, a floor standing unit and a personal belt located
Published 2 November 2020
The contractor used a surfacing technique that has not been used in the UK previously on a bridge
Published 12 October 2020
Use of Foam Chief providing a surface foam cover to excavated materials and is one of the most
Published 12 October 2020
Holobuilder is an application to create 360 digital versions of a site, photographs record site
Published 12 October 2020
Operatives are required to confirm that they have read the daily hazard board before going onto