Tags

Use of Personal HAVS Monitoring Equipment

Published 9 January 2018

We have recently installed a new personal HAVS monitoring and alert system to our small tools at


Tawny Owl Rescued from Drainage Ditch

Published 9 January 2018

During some recent works on the M18 and M180 project to renovate 40,000m of drainage ditches and


Wellbeing Questionnaire

Published 5 January 2018

The Mace team at Grosvenor Crescent attempted to quantify wellbeing statistically. A wellbeing


Reuse of Borehole Water

Published 5 January 2018

The Mace team at University College London implemented a measure to reduce water consumption whilst


Garden Refurbishment in the Local Community

Published 5 January 2018

The project team conducted a DIY SOS Big Build project to refurbish the Parkside Gardening


Use of Broadband Reverse Alarms

Published 5 January 2018

The project team at the Tottenham Hotspur Stadium Development have implemented the use of broadband


Creating a Culture of Inclusion

Published 5 January 2018

Mace have made a targeted effort to ensure that Mace has a culture of inclusion. Mace senior


Environmental Alert Action Process

Published 2 January 2018

The Mace team at the Tottenham Hotspurs Stadium Development have created an Environmental Alert


NRMM Emissions Testing

Published 2 January 2018

Mace have continued their work with Kings College London (KCL), attempting to tackle emissions and


Christmas Card Photography Competition

Published 2 January 2018

During the festive season, the Mace team at the Greenwich Peninsula Upper Riverside development


Water Recycling Wheel Wash

Published 2 January 2018

Mace at new stadium development procured a water recycling road sweep (from JM Clark) specifically


Increasing the Standards of the Working Environment

Published 2 January 2018

The Greenwich Peninsula Upper Riverside welfare facilities have been designed to improve the


Upcycling PPE

Published 18 December 2017

Whilst clearing out the welfare changing rooms to remove used PPE from a previous subcontractor and


Renovating Safety Barrier Beams for Reuse

Published 18 December 2017

We aim to develop products and techniques which not only increase cost savings, but that benefit


Fuel Resistant Material in Laybys

Published 18 December 2017

On the A64 dual carriageway around the southern side of York, there are a number of laybys for use


The Best Practice Hub is provided by the Considerate Constructors Scheme