Tags

Vertical Meadow – Green Wall on Hoarding

Published 12 September 2022

In conjunction with the estate, the contractor has had a green wall installed on a section of the


Use of Wysebase Crates

Published 12 September 2022

This contractor has used Wysebase crates on the project as a carbon-neutral alternative to concrete


Cutting Unistrut without a Grinder

Published 12 September 2022

On this product they have been utilising a Ridgid Strutslayr tool to cut unistrut that removes


Community Arts Project

Published 12 September 2022

This contractors community artworks initiative endeavours to sends a signal to the communities


Building Strength to Prevent Workforce Injuries

Published 12 September 2022

This initiative is focused on preventing repetitive strain injuries in construction which currently


Residents Women in Construction Bootcamp

Published 12 September 2022

Over the past few months this contractor has been working with the Royal Borough of Greenwich and


Virtual Reality Training for Fire Marshals

Published 12 September 2022

Currently large numbers of fire marshals receive only presentations which do not require and cannot


Embodied Carbon

Published 10 September 2022

The embodied carbon for this prohect's offices was calculated using BS EN 15978:2011 and guidance


Minimising Impact on Local Wildlife

Published 7 September 2022

On this project they have invested and continue to invest in the green spaces and wildlife areas in


Zen Zone

Published 7 September 2022

This contractor has created a small area and named it the 'Zen Zone'. The area consists of


How to Cut Carbon On Site Video

Published 7 September 2022

As part of this sites drive to reduce carbon in line with their 2030 and 2040 commitments, the site


Free Lunch Bag Initiative

Published 7 September 2022

This contractor has introduced a free lunch bag initiative on their project. They have had some


Washbox System

Published 2 September 2022

This contractor has established a washbox equipment wash station which has its own water supply,


Plasma Cutter

Published 2 September 2022

A plasma cutter was designed, fabricated and commissioned to sit on top of the permanent casing


Utilising Tekla Model and Augmented Reality for Bridge Installation and Tensioning

Published 2 September 2022

Complex large scale projects inevitably present a wide range of challenges. The Tekla model was