Modular Bath Protection and Safety Handrail System 2 votes, average: 5.00 out of 52 votes, average: 5.00 out of 52 votes, average: 5.00 out of 52 votes, average: 5.00 out of 52 votes, average: 5.00 out of 5

Published 22 March 2021 | No comments
Written by Jon Ankiewicz
CategoriesFalling objects
During the construction of the projects onsite mock up apartment, the contractor in collaboration with the subcontractor, identified that carrying out the stone installation in and around the bath unit was going to pose a risk to the operatives trying to manoeuvre the large format stone pieces above the bath, whilst standing within the curvature of the bath. Another key...

Assisting Employees with Applying for the EU Settlement Scheme 1 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 5

Published 22 March 2021 | No comments
Written by Bruno Tiosso
CategoriesDisadvantaged and minority groups support Literacy and numeracy support
The EU settlement scheme is designed to offer EU, non-EU EEA and Swiss citizens living in the UK before the end of the transition period, and their eligible family members, the opportunity to protect their residence in the UK after the transition period has ended. On this project around 65% of the workforce are coming from abroad with the majority...

Social Value Report 1 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 51 vote, average: 5.00 out of 5

Published 8 March 2021 | No comments
Written by Kieran Ronnie
CategoriesDocumented activities and targets for community engagement Progress and achievement against plan Tracking and recording of local contribution achieved
This contractor have been working to accurately track and measure the social and economic impact of their construction operations, in particular looking at the social return on investment and social profit ratio. Using social profit calculator methodology accredited by Social Value UK, the professional body for social value and impact management, they can measure the impact of their employment and...

Promoting Lighthouse Club’s Free Mental Health and Wellbeing Training Course

Published 8 March 2021 | No comments
Written by Bruno Tiosso
CategoriesMental health
Working in the construction industry is one of the deadliest professions in the UK, not just because of the dangers of heavy machinery; the suicide rate for construction workers is more than three times the national average for men. On this project, they are committed to assisting their workforce as much as possible. They have 15 Mental Health First Aiders...

Multilingual Online Safety Induction

Published 8 March 2021 | No comments
Written by Bruno Tiosso
CategoriesDisadvantaged and minority groups support English not as first language support
The contractor has introduced a paperless multilingual online safety induction. The online induction is a video with embedded questions which the viewer should be capable of answering and obtaining the 80% pass mark. The video has subtitle options in Lithuanian, Polish, Bulgarian and Romanian. Volunteers are made available to help with translation for the site specific induction. Anyone passing the...

Mental Health First Aider Sticker

Published 8 March 2021 | No comments
Written by Bruno Tiosso
CategoriesMental health
The contractor on this project team is very committed to promote mental health and wellbeing. The volunteer Mental Health First Aiders have a gold coloured sticker attached to their safety helmets, in order to make them easier to identify. During safety induction, new workers are informed about the project’s Mental Health First Aider volunteers and how to identify them.

Falling Objects Scenarios Video

Published 8 March 2021 | No comments
Written by Ashleigh Lang
CategoriesNear miss
Although all measures are taken to prevent dropped and falling objects on site, human error can still occur when working at height and perimeter edges. On this project they have worked with Multivista to develop a scenarios video with regards to falling objects. The video takes 3 scenarios, played by individuals who work on our site, these scenarios are: A...

Emergency Response Team

Published 8 March 2021 | No comments
Written by Ashleigh Lang
CategoriesEmergency preparedness First aid
Whilst intensive plans and procedures are put in place to protect everyone’s safety on site with regards to injury, things can still happen and people are still taken unwell. On this project they have set up an emergency response team led by they FREC3 and ex forces personnel who are dedicated and passionate about first aid on site. Between them...

Crane Radio Recording System

Published 8 March 2021 | No comments
Written by Bruno Tiosso
CategoriesControls and expected behaviours Unsafe condition reporting
On this project the contractor is using a crane radio recording system The system records the conversations of all crane radio channels, with the main device being kept locked in an Office, accessible to some personnel. The benefit of having the system on this project is that it can be used to monitor crane conversations and records can be used...

Red Light to Inform Operatives that Hoist is Out of Service

Published 1 March 2021 | No comments
Written by Bruno Tiosso
CategoriesControls Health risk assessments and monitoring
On this project they have 13 car hoist, covering 6 building and basement areas, and they have implemented a system to inform workforce when hoist are out of action. On every hoist landing they have installed a red light (hoarding light). In case the hoist is out of service, then hoist operator will then switch on the red light. A...

First Response Emergency Care Site Responder

Published 1 March 2021 | No comments
Written by Ashleigh Lang
CategoriesEmergency preparedness First aid Unsafe condition reporting
This project have a trained Level 3 First Response Emergency Care (FREC3) Responder on site to support with any potential incidents. This ensures that if there is an incident on site they have better skills and knowledge to deal with it. The additional skills they are able to perform are: Medical emergencies – Clinical lead until emergency services arrive Patient...

Working Inside Cores Procedure

Published 15 February 2021 | No comments
Written by Bruno Tiosso
CategoriesControls and expected behaviours
For Safety reason, all working inside the cores must be coordinated, to ensure fire escape routes do not get compromised. This work must be agreed with the contractor and coordinated on DABS meetings, with no work to take place unless agreed and authorised by the contractor. This must be communicated on DABS the day before works take place. Once agreed,...

Promoting TFL’s Online Cycle Skills Course to the Workforce

Published 15 February 2021 | No comments
Written by Bruno Tiosso
CategoriesCycle safety Pedestrian safety
Since the pandemic started the project team have taken measures to encourage the use of bicycle to travel around London, therefore having less site works using public transport. On a daily basis around 50 site workers use the projects bike store, with a large number of the workforce using Santander Cycles. Therefore, to promote safety they have been promoting TFL’s...

Promoting Nearest Santander Cycle Docking Stations

Published 15 February 2021 | No comments
Written by Bruno Tiosso
CategoriesControls and expected behaviours
Following Government request for the construction industry to look at ways to ease the burden on the London underground and public transport system at this current time of extreme pressure on key workers, the project team have implemented some measures including: increased bike store capacity, creating battery charging points for electric scooter and staggered times to access and egress the...

Online Waste Bin Request System

Published 15 February 2021 | No comments
Written by Bruno Tiosso
CategoriesPeriodic inspection and clean-up of boundaries Placement of waste
This project is a mixed use scheme sited on the Old Scotland Yard site, consisting of 268 fully fitted out residential units which are incorporated within 6 residential towers which sit above the podium buildings. Therefore, there is not much space available for waste bins on work areas. The contractor have instructed their logistics subcontractor to provide an ‘Online Waste...

The Best Practice Hub is provided by the Considerate Constructors Scheme