Lime Improved Japanese Knotweed Risk Material

Published 29 May 2022 | No comments
Written by Robert Andrews
CategoriesIdentify potential natural environment detriment Removal of invasive species
Japanese Knotweed was known to be an issue in the field where the south car park is being constructed for a number of years prior to the commencement of the project. Chemical treatment of the knotweed was intermittently undertaken over several years with a treatment bund created in the north east corner of the site and knotweed contaminated material moved...

Provision of Shuttle Bus Service

Published 24 May 2022 | No comments
Written by Robert Andrews
CategoriesControlled access Parking facilities/arrangements Planning of traffic routes
To accommodate construction works out on the main road on the St Erth Multi-Modal Hub contract, Wills Bros foresaw an issue as part of the works planning which would block the public from accessing public transport and developed a plan to ensure the public weren’t inconvenienced. The Drainage Works along Station Approach into Treloweth Lane were taking place at night....

Learning Driver Operator

Published 19 May 2022 | No comments
Written by Yara Gomes
CategoriesCommunication and training of requirements
A Learning Driver Operator (LDO) is a program that establishes requirement for new machine drivers. LDO’s must be assigned a mentor for the duration of the LDO period. The management of the project are responsible for assigning their most experienced drivers as mentors. The LDO program provides new personnel guidance to insure they understand site layout, equipment and systems onsite...

Risk Mapping

Published 5 May 2022 | No comments
Written by Yara Gomes
CategoriesHealth risk assessments and monitoring Incident investigation Inspection and assurance Risk assessments
Risk Mapping is a graphic representation of a set of factors present in the workplace, capable of causing damage to workers’ health: accidents and occupational diseases. Such factors originate in the various elements of the work process (materials, equipment, facilities, supplies and workspaces) and the structure of work organisation (physical arrangement, work rhythm, work method, work posture, working hours, work...

Water Pollution Management and Mitigation

Published 9 December 2021 | No comments
Written by Scott Duncan
CategoriesSpill prevention Water saving measures
Wills Bros have demonstrated unique techniques when dealing with water management. The aim of this study is to provide a narrative to the water management and mitigation methods employed during the Maybole project and to discuss the end solution adopted to provide an example of best practice techniques for water management on construction sites. A number of methods were adopted...

Temporary Footbridge

Published 14 October 2021 | No comments
Written by Joseph Seery
CategoriesControlled access
This contractor implemented a temporary footbridge over trenches on site that offers protection to all contractors, subcontractors and site personnel on the site. This is a simple and effective initiative and highlights good safety practice on site. Two of these bridges were made up on site and acts as the crossing points over the trenches. As lining works and other associated...

Wills Sisters

Published 2 August 2021 | No comments
Written by Yara Gomes
CategoriesDisadvantaged and minority groups support
Women make up around 14% of construction industry professionals and this number can only be set to rise with more and more women choosing construction jobs. Misconceptions about gender specific roles are gradually diminishing with the growing number of women choosing a career in construction. This project is promoting a toolbox talk about women in construction. The toolbox talk brings...

RoSPA Health and Safety Team of the Year Winner

Published 19 July 2021 | No comments
Written by Kieran Doona
CategoriesConsultation on health and safety Incident investigation
This project was delighted to be announced as the UK-Wide Winner of the ‘Health & Safety Team of the Year’ Category of the RoSPA Awards 2020. This was a significant achievement because there is only one winner of this award in any given year from all of the companies who enter the RoSPA Awards, and the contractor were delighted that...

Developing the Young Workforce Careers Video

Published 5 July 2021 | No comments
Written by Kieran Doona
CategoriesCommunity engagement Schools and nurseries Support for careers advice
On this contractors project they worked with ‘Developing the Young Workforce’ in Scotland to create a short video filmed on site promoting careers in the construction industry to young people. Videos such as this will help to encourage new entrants to the construction industry and so bridge the skills shortage. Developing the Young Workforce (DYW) is the Scottish Government’s Youth...

Carbon Neutral Project

Published 5 July 2021 | No comments
Written by Kieran Doona
CategoriesCarbon offsetting Carbon reduction
This project achieved carbon neutral status by registering with the ‘One Carbon World’ Scheme, working out its carbon footprint and purchasing carbon credits at a discounted rate. The carbon credits are then used in support of tree planting on a Rainforest Alliance validated sustainable forestry project. One Carbon World is a carbon neutral not-for-profit organisation and a global resource partner...

132kV Cable Protection Measures

Published 24 August 2020 | No comments
Written by Rachael Finlay
CategoriesCarbon offsetting
Our works on the Glasgow Airport Investment Area (GAIA) project involved providing protection measures to a series of fragile high voltage (132kv) cables which one of our new roads has to cross. Preliminary proposals for the protection measures involved a series of steel-reinforced concrete beams spanning an array of reinforced concrete piles. This solution was highly carbon-intensive, and the asset...

Best Practice Hub
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible.

Cookies are small pieces of text sent to your web browser by a website you visit. A cookie file is stored in your web browser and allows the site or a third-party to recognise you and make your next visit easier and the website more useful to you.

Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

We only use cookies to improve your experience and monitor web traffic. All data we collect on this site is anonymous and not shared or sold. Please find more information here

The Best Practice Hub is provided by the Considerate Constructors Scheme